Energy Storage Built for
Business-Critical Operations
Sodium-ion battery systems engineered for peak demand management, backup power, and renewable integration — with the safety and longevity C&I operations demand.
The Storage System Your Operations Deserve
Commercial and industrial facilities face a unique combination of high energy costs, strict uptime requirements, and growing pressure to decarbonize. Coulomb Technology's sodium-ion systems are purpose-built to address all three — delivering lower total cost of ownership, zero thermal runaway risk, and performance that holds up in the real world.
14% Lower 15-Year TCO
Fewer replacements, no thermal management costs, and longer cycle life add up to real savings.
Zero Thermal Runaway
Safer chemistry with less explosive properties and no fires to date seen during thermal runaway tests.
-20°C to 55°C Operation
Full rated capacity across extreme temperatures — no cold-weather derating.
Domestic Supply Chain
No cobalt, no lithium — sodium is abundant, domestically sourced, and tariff-resilient.
Four Ways C&I Facilities Deploy Coulomb Technology
Every installation is engineered around your specific load profile, utility rate structure, and operational requirements.
Peak Demand Management
For: Manufacturing, Logistics, Data Centers, Retail
The Challenge
Demand charges — billed on your single highest 15-minute interval each month — can account for 30–50% of a commercial utility bill. One spike from a compressor startup or EV charger surge can cost thousands.
The Coulomb Technology Solution- CoulombAI™ predicts demand peaks 15 minutes ahead and pre-discharges to shave them
- Typical demand charge reduction of 40–70% in the first year
- Payback periods as short as 3–5 years in high-rate markets
- No manual intervention — fully automated strategy execution
Critical Backup Power
For: Healthcare, Data Centers, Telecom, Food Processing
The Challenge
Grid outages cost C&I facilities an average of $150,000 per hour. Traditional diesel generators have 10–30 second startup delays and require costly fuel storage, maintenance, and emissions compliance.
The Coulomb Technology Solution- Sub-20ms seamless transfer — no gap in power delivery
- 2–8 hours of backup at full facility load, scalable to 24+ hours
- Zero emissions, zero fuel logistics, zero startup delay
- EnergiOS™ continuously monitors grid health and pre-positions charge for seamless transfer
Material Handling Electrification
For: Warehousing, Distribution, Cold Storage, Ports
The Challenge
Electrifying forklift fleets and charging infrastructure creates massive demand spikes. A 50-forklift fleet charging simultaneously can add 500–800 kW of instantaneous demand — turning electrification savings into a utility bill nightmare.
The Coulomb Technology Solution- Intelligent load-leveling absorbs EV charging spikes before they hit the meter
- Enables full fleet electrification without expensive utility service upgrades
- Works with any charging infrastructure — no proprietary hardware required
- Typical ROI: 4–6 years including avoided service upgrade costs
Renewable Integration & Self-Consumption
For: Manufacturing, Agriculture, Retail, Corporate Campuses
The Challenge
Solar generation peaks at midday; facility demand peaks in the afternoon. Without storage, excess solar is exported at low rates while facilities still pay peak prices for grid power during their highest-demand hours.
The Coulomb Technology Solution- Store midday solar surplus and deploy it during afternoon peak demand windows
- Increase solar self-consumption from ~30% to 85%+ with optimized dispatch
- Qualify for SGIP, ITC, and state-level storage incentives
- CoulombAI™ optimizes solar + storage dispatch in real time against utility rates
The Numbers That Matter
Coulomb Technology systems are engineered to deliver measurable financial returns — not just sustainability checkboxes. Our sodium-ion chemistry and AI-driven dispatch combine to maximize every revenue stream available to your facility.
- Demand charge reduction (30–70%)
- Energy arbitrage (time-of-use optimization)
- Demand response program participation
- Virtual Power Plant (VPP) revenue
- Solar self-consumption increase (up to 85%)
- Avoided utility service upgrade costs
- 30% Federal Investment Tax Credit (ITC)
- SGIP (California) — up to $0.40/Wh
- NYSERDA, MassCEC, and state programs
- MACRS 5-year accelerated depreciation
- Utility demand response incentive payments
From Consultation to Commission in 90 Days
Our team handles everything from initial load analysis to utility interconnection — so you can focus on running your facility.
System Design Consultation
Our engineers analyze your 12-month utility bills, load profile, and site constraints to design the optimal system configuration and project the financial returns.
Permitting & Installation
We manage utility interconnection, building permits, and coordinate with your preferred EPC contractor or our certified installation partners.
Commissioning & Ongoing Support
CoulombAI™ is configured to your specific rate structure and goals. Our 24/7 monitoring team ensures peak performance throughout the system's 20-year life.










See What Coulomb Technology Can Do for Your Facility
Our team will analyze your utility bills, model your specific ROI, and design a system sized for your exact load profile — at no cost.