Energy Storage Built for
Business-Critical Operations
Sodium-ion battery systems engineered for peak demand management, backup power, and renewable integration — with the safety and longevity C&I operations demand.
The Storage System Your Operations Deserve
Commercial and industrial facilities face a unique combination of high energy costs, strict uptime requirements, and growing pressure to decarbonize. Coulomb Technology's sodium-ion systems are purpose-built to address all three — delivering lower total cost of ownership, zero thermal runaway risk, and performance that holds up in the real world.
14% Lower 15-Year TCO
Fewer replacements, no thermal management costs, and longer cycle life add up to real savings.
Zero Thermal Runaway
Sodium-ion chemistry is inherently non-flammable — no fire suppression systems required.
-20°C to 55°C Operation
Full rated capacity across extreme temperatures — no cold-weather derating.
Domestic Supply Chain
No cobalt, no lithium — sodium is abundant, domestically sourced, and tariff-resilient.
Four Ways C&I Facilities Deploy Coulomb Technology
Every installation is engineered around your specific load profile, utility rate structure, and operational requirements.
Peak Demand Management
For: Manufacturing, Logistics, Data Centers, Retail
The Challenge
Demand charges — billed on your single highest 15-minute interval each month — can account for 30–50% of a commercial utility bill. One spike from a compressor startup or EV charger surge can cost thousands.
The Coulomb Technology Solution- CoulombAI™ predicts demand peaks 15 minutes ahead and pre-discharges to shave them
- Typical demand charge reduction of 40–70% in the first year
- Payback periods as short as 3–5 years in high-rate markets
- No manual intervention — fully automated strategy execution
Critical Backup Power
For: Healthcare, Data Centers, Telecom, Food Processing
The Challenge
Grid outages cost C&I facilities an average of $150,000 per hour. Traditional diesel generators have 10–30 second startup delays and require costly fuel storage, maintenance, and emissions compliance.
The Coulomb Technology Solution- Sub-20ms seamless transfer — no gap in power delivery
- 2–8 hours of backup at full facility load, scalable to 24+ hours
- Zero emissions, zero fuel logistics, zero startup delay
- EnergiOS™ continuously monitors grid health and pre-positions charge for seamless transfer
Material Handling Electrification
For: Warehousing, Distribution, Cold Storage, Ports
The Challenge
Electrifying forklift fleets and charging infrastructure creates massive demand spikes. A 50-forklift fleet charging simultaneously can add 500–800 kW of instantaneous demand — turning electrification savings into a utility bill nightmare.
The Coulomb Technology Solution- Intelligent load-leveling absorbs EV charging spikes before they hit the meter
- Enables full fleet electrification without expensive utility service upgrades
- Works with any charging infrastructure — no proprietary hardware required
- Typical ROI: 4–6 years including avoided service upgrade costs
Renewable Integration & Self-Consumption
For: Manufacturing, Agriculture, Retail, Corporate Campuses
The Challenge
Solar generation peaks at midday; facility demand peaks in the afternoon. Without storage, excess solar is exported at low rates while facilities still pay peak prices for grid power during their highest-demand hours.
The Coulomb Technology Solution- Store midday solar surplus and deploy it during afternoon peak demand windows
- Increase solar self-consumption from ~30% to 85%+ with optimized dispatch
- Qualify for SGIP, ITC, and state-level storage incentives
- CoulombAI™ optimizes solar + storage dispatch in real time against utility rates
The Numbers That Matter
Coulomb Technology systems are engineered to deliver measurable financial returns — not just sustainability checkboxes. Our sodium-ion chemistry and AI-driven dispatch combine to maximize every revenue stream available to your facility.
- Demand charge reduction (30–70%)
- Energy arbitrage (time-of-use optimization)
- Demand response program participation
- Virtual Power Plant (VPP) revenue
- Solar self-consumption increase (up to 85%)
- Avoided utility service upgrade costs
- 30% Federal Investment Tax Credit (ITC)
- SGIP (California) — up to $0.40/Wh
- NYSERDA, MassCEC, and state programs
- MACRS 5-year accelerated depreciation
- Utility demand response incentive payments
From Consultation to Commission in 90 Days
Our team handles everything from initial load analysis to utility interconnection — so you can focus on running your facility.
System Design Consultation
Our engineers analyze your 12-month utility bills, load profile, and site constraints to design the optimal system configuration and project the financial returns.
Permitting & Installation
We manage utility interconnection, building permits, and coordinate with your preferred EPC contractor or our certified installation partners.
Commissioning & Ongoing Support
CoulombAI™ is configured to your specific rate structure and goals. Our 24/7 monitoring team ensures peak performance throughout the system's 20-year life.










See What Coulomb Technology Can Do for Your Facility
Our team will analyze your utility bills, model your specific ROI, and design a system sized for your exact load profile — at no cost.